Logo Onuma Inc.
 Onuma Tools and Views


ONUMA Help > Onuma Tools and Views > Onuma Settings
Onuma Settings

Onuma Settings

Settings apply to each scheme and are maintained per scheme. This allows the analysis of a scheme by duplicating it and applying different settings to each version.

You can access the Settings in two ways:

1. Clicking the Settings icon pics062Icon.jpg on the project list
2. Clicking the Settings link pics063tab.jpg while editing a site or scheme


Admin Settings

  • Available to Onuma Studio Administartors Only

General Settings

genset.jpg
  • Data Source Settings - Edit current data settings
    • Data Sources Available:
      • DoD Region
      • DoD Midpoint
      • OSCRE Code Version
  • Department Settings - Rename departments and add additional departments
  • Space Relationships - Rename space relationships
  • Custom Settings - Edit building and/or space attribute groups, time-based colors, and/or space custom attributes
  • Copy Settings - Allows you to copy settings from another project. Settings include: Departments, Space Relationships, and Custom Settings

Site Settings

siteset.jpg
  • Site Settings - Edit site information
    • Site Information Includes:
      • Scheme Name
      • Units
      • Currency
      • General Scheme Description
      • Form 1391
        • Proposed Construction
        • Mechanical System
        • Other Data / Occupants
        • Space Requirements (Adequate/Substandard)
        • Requirement (Description of what is needed)
        • Current Situation (Currently Available)
        • Impact if not Provided (How does it impact the mission)
        • Economic Analysis
        • Basis of Estimates
        • Basis of Construction Cost
  • Sitework Cost Settings - Add site cost information or even create your own cost additions
    • Site-work Cost Sections:
      • Demolition
      • Site-work
        • Hazmat or Asbestos
        • Paving
        • Landscape
      • Utilities
        • Utilities (underground or above)
        • Septic System
        • Emergency Generator
      • Waterfront / Marine
        • Pier
        • Moorings
      • Other Cost
        • Security & Force Protection
        • Temporary construction
      • Sub-Total Site-work Cost
      • Factors and Fees
        • Cost Region Factor
        • Construction Contingency
        • Design Contingency
        • Escalation to Mid-Point of Construction
        • Fees
        • Planning & Design
        • Govt. Inspection
      • Total
  • Site Attributes - Edit Site Attributes
    • Site Attributes Available:
      • Min FAR
      • Max FAR
      • Default Site Extrusions
      • FAR Color Coding
      • Upload FAR CSV
      • Building Zone
      • Upload Building Zone CSV
  • Site Component Attributes
    • Site Component Attributes Available:
      • Intersection Points
      • Public Transportation
      • Manholes
      • Utility Poles
      • Parking/Roads
      • Construction Pads
      • Parcels/Lots
      • Utility Lines
    • Please see Custom Attributes for Site Components for more detail.

Building Settings

buildingNEW.jpg
  • Building Settings - Edit Building Settings
    • Building Settings Available:
      • Building Name
      • Building Type
        • Res/Bus/Edu/etc.
      • # of
        • Residential Units
        • Hotel Rooms
        • Hospital Beds
        • Shelter Capacity
      • Construction Dates (Start/End/Demolition)
      • Gross Area Calculation
      • Custom Factor
      • Energy Use
      • SUI
      • MDI
      • FCI
      • RPFN Number
      • Offset Boundary
      • Roof Runoff Actual sqft
      • Roof Runoff Overwrite sqft
      • Solar panel sqft
      • Roof Material
      • Exterior Glazing sqft
      • Exterior Wall excl. glazing sqft
      • Exterior Wall material
      • HTML Description
  • Floors - Edit floor names, elevations, heights, and slab thickness
  • Uniformat - Specify preliminary project descriptions
    • PPD Uniformat:
      • Add a new Element
      • Description
      • Quantity
      • Units
      • Rate
  • LEED - Checklists for New Construction, Core and Shell, and Existing Buildings
  • Systems - Add COBie Data Systems
  • Types - Add COBie Data Types
  • Cost Est - Estimate construction costs for the building
    • Cost Est Worksheet Contains:
      • Construction Costs
        • Prep for Construction
          • Demolition
        • Building Construction
          • Cost for New
          • Cost for Renovation
          • Structural System upgrade
          • Security & Force Protection
          • Temporary Construction
        • Subtotal
        • Factors
          • Cost Region
          • Construction Contingency
          • Design Contingency
          • Escalation
      • Non-Construction Cost
        • Furishings & Equiment
          • Use Tool Calc.
          • Define Value
        • Electronics Outfitting
          • Equipment
        • Other Costs
          • Occupant Relocation
          • Land Purchases/Easements/Costs
          • Lease / Rental
        • Sub total
        • Factors
          • Design Cont.
          • Escalation
        • Fees
          • Const. Super. Inspct. Overhead of Const.
          • Planning and Design
          • Govt. Inspection
      • Total Building Cost

Space Settings

spaceset.jpg
  • Space Settings - Edit individual spaces settings
    • Space Settings Available:
      • Space Name
      • Cost Calculation
      • Space Number
      • Code
      • Staff
      • Capacity
      • MDI
      • SUI
      • FCI
      • OSCRE
      • Omni Class
      • Description
  • Space Settings Matrix - Edit multiple space settings all on one spreadsheet

2010-04-06 12:44:46